Buy off-plan property in Dubai: the 2026 buyer's guide
Off-plan projects for sale in Dubai right now
Apartments, townhouses and villas currently on sale, with the starting price published by the developer and, when known, the payment plan. Each card opens the project page: unit types, payment schedule, expected handover and DLD data.
- SAMANA Downtown One · SAMANA Developers · Downtown Jebel Ali, Dubai · from AED 689,000
- REEF 995 · REEF Luxury Developments · Dubailand Residence Complex, Dubai · from AED 707,777
- Symphony by Chaimaa · Chaimaa Holding · Majan, Dubai · from AED 1,130,000
- Isla Private Residences · Chaimaa Holding · Dubai Islands, Dubai · from AED 2,200,000
- Samana Golf Avenue · Samana Developers · Dubai Sports City · Studio, 1 & 2 BR · from AED 460,000
- Danube Fashionz · Danube Properties · Dubai South · Studio, 1 & 2 BR · from AED 499,000
- Imtiyaz Sports City · Imtiyaz Developments · Dubai Sports City · Studio, 1 & 2 BR · from AED 520,000
- Stories by Mirfa · Mirfa IBC · Dubai South · Studio, 1 & 2 BR · 2 Years Post-Handover plan · from AED 580,000
- The Harmony · Al Mizan · Dubai South · Studio, 1, 2 & 3 BR · 30/70 or 70/30 plan · from AED 660,000
- Serene Residences · Al Mizan · Dubai South · Studio, 1, 2 & 3 BR · 60/40 plan · from AED 690,000
- Cascada 2 at Waada · BT Properties · Dubai South · 1, 2 & 3 BR · 70/30 plan · from AED 872,000
- Flora Bay at Dubai Islands · Cay Residences · Dubai Islands · 1, 2, 3 & 4 BR · from AED 1,860,000
- Bay Grove Residences 3 at Dubai Islands · Nakheel · Dubai Islands · 1, 2 & 3 BR · from AED 2,000,000
- 74% of residential sales were off-plan (DLD, 12 months)
- 110,979 off-plan sales registered in 12 months
- 1,237 projects under construction in the DLD registry
- 85,639 homes registered for completion in 2027
- 4% Dubai Land Department fee
- 0 buyer commission with Cevitas
Off-plan property in Dubai: the market in figures
Off-plan means buying a home from the developer before or during construction. From 4 November 2025 to 4 November 2026, the Dubai Land Department (DLD) registered 149,920 residential sales, of which 110,979 were off-plan, or 74%. In the DLD project registry read on 1 November 2026, 1,237 projects were under construction and 1,236 of them had an escrow account open, as the law requires before a developer can sell.
| Indicator | Figure | Official source |
|---|---|---|
| Residential sales, 12 months | 149,920 | DLD transactions (data.dubai 470061) |
| Of which off-plan | 110,979 (74%) | DLD transactions |
| Median price per sq ft, all residential sales | AED 1,722 (about USD 469) | DLD transactions, Cevitas median |
| Projects under construction | 1,237, of which 1,236 with escrow | DLD project registry (data.dubai 467654) |
| DLD registration fee | 4% of the price | DLD fee schedule |
The dirham is pegged to the US dollar at AED 3.6725 per dollar by the Central Bank of the UAE, so every AED figure in this guide converts at a fixed rate: AED 1,000,000 is about USD 272,300, or about SAR 1,021,000 at the Saudi riyal's own dollar peg of 3.75.
Investing in the UAE: 5 key figures.
Official figures · sources checked on 11 Nov 2026
- 0% personal income tax: The United Arab Emirates does not levy income tax on individuals. Source: Official portal u.ae.
- 0% tax on an individual's rent and resale gain: An individual investing in their own name, without a trade licence, is not subject to Corporate Tax on rent or resale gains, whatever the amount (Cabinet Decision No. 49 of 2023). Source: Ministry of Finance · Federal Tax Authority.
- AED 2M for a 10-year Golden Visa through property: One or more properties worth at least AED 2 million in total, ready or off-plan; a loan from an approved local bank is accepted. Source: ICP · Dubai Land Department.
- 4% Dubai Land Department registration fee: Official sale tariff: 2% on the buyer's side and 2% on the seller's side of the sale value, with the split set in the sale contract. Source: Dubai Land Department.
- 100% freehold ownership for foreigners in designated areas: Dubai Law No. 7 of 2006 on land registration opens freehold ownership to foreigners in designated areas, with a title deed registered at the DLD. Source: Law No. 7 of 2006.
The UAE applies 5% VAT and 9% Corporate Tax to businesses. General information, not tax advice: your taxes also depend on your country of residence.
Off-plan or ready property: which one suits you?
| Off-plan | Ready (resale) | |
|---|---|---|
| Seller | The developer, for a project registered with the DLD | An owner holding a title deed |
| Payment | Booking amount, then instalments during construction, sometimes after handover | Full price at transfer, in cash or with a mortgage |
| Price | The developer's launch price list | Negotiated, checked against registered sales in the building |
| Registration | Oqood interim register, then title deed at handover | Title deed transferred at a registration trustee office |
| Rental income | From handover | Immediately |
| Bank finance | Capped at 50% of the value under CBUAE rules | Depends on residency, value and the bank |
| Buyer commission | None with Cevitas: the developer pays the agency | Set in the agreement, plus 5% VAT |
Off-plan fits a buyer who prefers to spread the outlay over the construction period, does not need rent straight away and wants a new building in an area that is still growing. Ready fits a buyer who wants rent from day one, wants to see the unit, the building and the view, or plans to finance a large part with a mortgage. For the resale route, read our guide on how to buy property in Dubai and browse apartments for sale in Dubai.
Where off-plan sells in Dubai: sales and price per sq ft by area
Off-plan sales concentrate in new or expanding communities. The table lists the twelve areas with the most off-plan sales registered at the DLD over the last 12 months, the off-plan share of all sales in the area and the median price per sq ft of all residential sales there (off-plan and resale together).
| Area | Off-plan sales (12 months) | Off-plan share of the area's sales | Median price per sq ft | In US dollars |
|---|---|---|---|---|
| Dubai World Central | 11,571 | 98% | AED 1,686 | USD 459 |
| Jumeirah Village Circle (JVC) | 6,578 | 60% | AED 1,479 | USD 403 |
| Dubailand Residence Complex | 5,879 | 91% | AED 1,406 | USD 383 |
| Majan | 5,196 | 86% | AED 1,470 | USD 400 |
| Palm Deira | 4,339 | 99% | AED 2,750 | USD 749 |
| Jumeirah Village Triangle (JVT) | 3,083 | 85% | AED 1,645 | USD 448 |
| City of Arabia | 2,863 | 99% | AED 1,693 | USD 461 |
| Dubai Maritime City | 2,758 | 99% | AED 3,190 | USD 869 |
| Motor City | 2,753 | 80% | AED 1,730 | USD 471 |
| Dubai Creek Harbour | 2,657 | 69% | AED 2,559 | USD 697 |
| Downtown Jebel Ali | 2,480 | 95% | AED 1,708 | USD 465 |
| Arjan | 2,365 | 65% | AED 1,581 | USD 430 |
The Dubai-wide median over the same period is AED 1,722 per sq ft. An area where the off-plan share is close to 100% is an area being built now: rents and demand there form as buildings are handed over, so look at the master developer's plan and the transport links as much as at the project itself. Each area page gives the price history, rents and the projects registered there; for rents and gross yields by area, see our guide to Dubai rental yields.
Source: Dubai Land Department, Real Estate Transactions (data.dubai 470061), residential sales from 4 November 2025 to 4 November 2026, Dubai Open Data Licence. Price per sq ft = registered price / registered area, median; 1 m² = 10.764 sq ft; US dollars at the CBUAE peg of AED 3.6725.
Handover dates: how many homes are due in 2026, 2027 and 2028?
Every project under construction carries a completion date declared by its developer in the DLD project registry. Adding up the residential units by year, as recorded on 1 November 2026:
| Registered completion year | Units in projects under construction |
|---|---|
| 2026 | 61,639 |
| 2027 | 85,639 |
| 2028 | 78,698 |
| 2029 | 36,568 |
| 2030 | 12,313 |
| 2031 | 2,743 |
These dates can move, and part of what is announced for a given year is handed over later. In practice: read the completion date and the delay clauses in your own SPA, and compare your project's handover with the number of units due in the same area the same year, because many simultaneous handovers add supply to the rental market. Each project's registered progress and completion date are listed in our directory of off-plan projects registered with the DLD, and the Dubai real estate barometer tracks sales month by month.
Source: DLD project registry (data.dubai 467654), read on 1 November 2026, projects with status "active".
How to buy off-plan from abroad, step by step
- Shortlist registered projects. Compare three to five projects on the developer's official price list, floor plans and payment plan. Check each one in the Dubai REST app: project number, status, escrow account and progress.
- Reserve. Sign the reservation form; a passport copy is enough, UAE residency is not required. Pay the booking amount by international bank transfer in your own name to the project's escrow account.
- Sign the Sale and Purchase Agreement. The SPA sets the price, the payment schedule, the unit area and tolerance, finishes, completion date, delay penalties and cancellation terms. Most developers send it for electronic signature.
- Oqood registration. The developer records the sale in the DLD interim register within 90 days of signing and the 4% DLD fee is paid. The Oqood certificate in your name is your proof of ownership until handover.
- Instalments. Pay each call into the escrow account named in the SPA, keep every transfer receipt and follow the construction progress published by the DLD.
- Handover. Inspect the unit or have it inspected (snagging) before signing the handover form, pay the balance in cash or with a mortgage, and receive the title deed.
- Letting. Rent it out on a long lease registered through Ejari, or short term with a holiday home permit from Dubai's Department of Economy and Tourism.
None of these steps requires you to travel. If you cannot attend handover, a power of attorney lets a representative act for you. With Cevitas, the whole journey is handled remotely, in English, French or Arabic: see turnkey property investment in Dubai.
Paying from abroad. Your country of residence may have its own rules on transfers abroad or on declaring foreign assets: check them with your bank before you reserve, and always transfer from an account in your own name.
Off-plan payment plans, with a worked example in AED and USD
| Plan | During construction | At or after handover | Typical buyer |
|---|---|---|---|
| 60/40 | 60% | 40% at handover | The most common split at large developers |
| 50/50 | 50% | 50% at handover | Buyer who plans a mortgage or a sale at completion |
| 70/30 or 80/20 | 70 to 80% | 20 to 30% | Projects close to completion |
| Post-handover | 30 to 50% | Balance over 2 to 5 years after the keys | Investor who wants rent to cover part of the balance |
| 1% a month | Fixed monthly instalments | Depends on the project | Regular monthly budget |
Worked example: an AED 1,200,000 apartment on a 60/40 plan
Illustrative example. Percentages and construction milestones are set by each developer in the SPA; only the 4% DLD fee is an official rate. US dollar figures use the CBUAE peg.
| Payment | Trigger | Share | AED | USD (approx.) |
|---|---|---|---|---|
| Booking | Reservation form | 20% | 240,000 | 65,350 |
| DLD fee | Oqood registration | 4% (DLD rate) | 48,000 | 13,070 |
| Instalments 2 to 5 | Construction milestones in the SPA (for example 20%, 40%, 60%, 80%) | 4 × 10% | 480,000 | 130,700 |
| Handover | Keys | 40% | 480,000 | 130,700 |
| Total | 104% | 1,248,000 | 339,800 |
With a 40/60 post-handover plan on the same unit, you would pay AED 480,000 during construction (plus the AED 48,000 DLD fee) and AED 720,000 after handover, over the period set by the developer. Model your own schedule with the off-plan payment plan calculator. Real payment schedules of current projects are on each project page in the grid at the top of this guide.
What protects an off-plan buyer in Dubai
| Protection | What it guarantees | Official text or service |
|---|---|---|
| Project registration | The developer registers the project with the DLD, opens an escrow account and provides a guarantee (30% of construction completed, a bank guarantee or a cash deposit) before the DLD approves the project. | DLD service "Register project" |
| Permission to sell | A developer must be registered and authorised in writing before marketing off-plan units. | Law No. 8 of 2007, articles 4 and 5 |
| Escrow account | One account per project with an approved escrow agent; the money is reserved for the project and cannot be seized by the developer's creditors; funds are released as construction progress is certified. | Law No. 8 of 2007, articles 7, 9 and 12 |
| Stalled project | If a project stops, the escrow agent must have it completed or refund the buyers; a developer that does not start works within six months of approval can be struck off. | Law No. 8 of 2007, articles 15 and 17 |
| Oqood | Your contract is recorded in the DLD interim register within 90 days of signing, so your rights in the unit are on record before handover. | DLD service "Register the initial sale" |
| Retention | 5% of the escrow balance stays blocked for one year after completion to cover defects found at handover or during that year. | Law No. 8 of 2007, article 14 |
Two rights worth using before each instalment
- Progress letter. According to the DLD, before paying a construction-linked call you can ask for a certificate of the completion percentage issued by a DLD-approved project consultant; the payment is not due until the milestone is confirmed.
- Technical audit report. The DLD offers an independent technical audit of the project for AED 15,000 per unit (about USD 4,100).
If RERA cancels a project, the escrow account passes to the DLD's liquidation unit and the developer must return the amounts paid within 60 days of the decision, a period RERA can extend; disputes go to the Dubai Real Estate Court. Escrow protects where your money goes, it does not guarantee the handover date, the resale value or the rent: the developer's delivery record and the SPA clauses still matter.
Sources: Law No. 8 of 2007 (Dubai legislation portal), DLD services Register project and Register the initial sale, DLD FAQ.
If you can no longer pay: the procedure set by law
Article 11 of Law No. 13 of 2008 on the interim real property register, as replaced by Law No. 19 of 2020, sets a graduated procedure when an off-plan buyer stops paying. Nothing happens without it:
- The developer notifies the DLD of the buyer's default on the official form.
- The DLD checks and gives the buyer 30 days in writing to pay, and attempts a settlement; any agreement is attached to the contract.
- Without payment or agreement, the DLD issues a document confirming the procedure was followed and stating the project's completion percentage under RERA standards.
| Project completion | Developer's options | Maximum retained |
|---|---|---|
| Over 80% | Keep the contract and claim the balance, ask the DLD to auction the unit, or terminate | 40% of the unit value on termination, the rest refunded |
| 60% to 80% | Terminate | 40%, the rest refunded |
| Under 60%, works started | Terminate | 25%, the rest refunded |
| Works not started for reasons outside the developer's control, or project cancelled by RERA | Refund | None: full refund under Law No. 8 of 2007 |
Any refund is due within one year of termination or within 60 days of the unit's resale, whichever comes first, and the buyer can always go to court or arbitration. If an instalment looks difficult, talk to the developer before the due date: a rescheduling or an assignment of the contract (below) is usually the better route. Source: Law No. 19 of 2020 amending Law No. 13 of 2008 (the Arabic text prevails).
What it costs to buy off-plan in Dubai
| Item | Amount | When |
|---|---|---|
| DLD registration fee (Oqood) | 4% of the price; the SPA states who pays it, and many contracts put it all on the buyer | At Oqood registration, within 90 days of signing |
| DLD knowledge and innovation fees | AED 10 + AED 10 | At registration |
| Developer admin or Oqood processing fee | As set in the SPA | At booking or registration |
| Buyer commission | None with Cevitas | — |
| Mortgage registration, if financed | 0.25% of the loan | At handover |
| Service charges | Per sq ft per year, set for each building in the DLD service charge index | From handover |
Some developers cover part or all of the DLD fee during launches; we flag it in every shortlist. To total the fees on your own price, use the Dubai property buying costs calculator. Source: DLD service Request to register the initial sale and DLD fee schedule.
Financing an off-plan purchase
Most buyers pay the construction phase from their own funds, since developer payment plans carry no interest. A mortgage usually comes in for the handover balance.
- Central Bank of the UAE (CBUAE) rules cap the financing of an off-plan property at 50% of its value.
- Banks lend only on projects they have approved, usually as completion approaches.
- Several UAE banks lend to non-residents, each with its own conditions on income, currency and documents.
Test a mortgage on the handover balance with the Dubai mortgage calculator.
Who can buy off-plan, tax and the Golden Visa
Ownership. Law No. 7 of 2006 on real property registration lets non-UAE nationals own freehold property in Dubai's designated areas, where almost all off-plan projects are. Residency is not required: a valid passport is enough, and you can buy alone, jointly or through an eligible company.
Tax. The UAE does not levy personal income tax, as the official portal u.ae states, and according to the Ministry of Finance, an individual's income from real estate held in their own name, without an activity that requires a trade licence, is not subject to UAE corporate tax. Your country of tax residence applies its own rules to rent and gains: check them with an adviser at home. French-speaking readers will find country-by-country guides on our French site, for example investing in Dubai from France.
Golden Visa. According to the ICP guide, one or more off-plan properties worth at least AED 2,000,000 in total (about USD 544,600), bought from an approved local developer, can qualify for the 10-year Golden Visa. We check with the DLD that the project and the amount already paid are accepted before you reserve. Details and fees: Dubai Golden Visa through property.
How to choose an off-plan project and developer
- The developer first. Look at what it has delivered, how late, with what build quality, and how its buildings have aged. Our directory of Dubai developers lists each developer's registered projects and DLD sales.
- The checks, all online. The project is registered and visible in Dubai REST; the escrow account is in the project's name at an approved bank; the advert carries a DLD Trakheesi permit; the agency (ORN) and the broker (BRN) are RERA-licensed.
- The area's pipeline. A good project in an area where thousands of units complete the same year will face pressure on rents: compare with the handover table above.
- The product. Net area, layout, orientation, view, parking and amenities; compare the price per sq ft with neighbouring projects and with ready resales nearby.
- The payment plan. It must match your cash flow, especially the handover payment.
Golden rule. Never pay a deposit into a personal account or an agency account. The only right account is the project escrow account named in the SPA.
Selling before handover (assignment)
Many investors sell their contract before completion. It is allowed, within rules set by each developer:
- most developers require a minimum share of the price to be paid first, often 30 to 40%;
- the developer charges a transfer fee and issues a no-objection certificate (NOC);
- the new buyer pays the 4% DLD fee again on the resale price;
- a gain is never guaranteed: it depends on the market at the time you sell.
Before buying with a resale in mind, ask yourself whether you could pay the handover instalment if you do not sell, and whether the unit would let well if you keep it.
After handover: snagging, service charges and letting
- Snagging. Inspect the unit and give the developer a written list of defects before signing the handover form. Defects found at handover or within a year are covered by the 5% escrow retention (Law No. 8 of 2007, article 14).
- Title deed. Issued by the DLD once the balance is paid; check that the unit number and area match the contract.
- Service charges. They start at handover and are charged per sq ft each year; ask the developer for the estimate before you reserve and include it in your net yield.
- Letting. Long leases are registered through Ejari in the Dubai REST app; short-term letting needs a holiday home permit from the Department of Economy and Tourism and the building's approval. An owner living abroad usually hands this to a licensed manager: see Dubai property management.
Buying off-plan with Cevitas
Cevitas Real Estate is a RERA-licensed agency in Dubai (ORN 49294) co-founded by Ahmed Benjas. On off-plan purchases we work with Dubai's main developers and you pay the developer's price, with no buyer commission:
- a short shortlist of three to five projects, with official price lists, payment plans and registered completion dates;
- registration, escrow and developer track-record checks before any reservation;
- follow-up of every instalment, handover inspection and letting;
- everything remote, in English, French or Arabic, on +971 55 772 2710.
Read the full picture in our guide to investing in Dubai real estate, or compare the best areas to invest in Dubai.
Official sources
- Dubai Land Department, Real Estate Transactions: residential sales from 4 November 2025 to 4 November 2026; medians calculated by Cevitas.
- Dubai Land Department, Projects: projects under construction, escrow accounts and completion dates, read on 1 November 2026.
- Dubai Land Department (DLD): fee schedule, Oqood, Dubai REST, Trakheesi, FAQ; RERA: project registration and escrow.
- Dubai legislation portal: Law No. 7 of 2006, Law No. 8 of 2007, Law No. 13 of 2008 and Law No. 19 of 2020.
- Central Bank of the UAE: dirham peg and mortgage rules; Saudi Central Bank (SAMA): riyal peg.
- u.ae and the UAE Ministry of Finance: tax; ICP: Golden Visa.
"From" prices in the project grid come from developers' official price lists and are confirmed at reservation.
Frequently asked questions
How do I buy off-plan property in Dubai?
Choose a project registered with the Dubai Land Department, reserve the unit with the developer by paying the booking amount into the project escrow account, sign the Sale and Purchase Agreement, and have the sale recorded in the Oqood register within 90 days with the 4% DLD fee. You then pay the instalments into escrow and receive the title deed at handover.
Can foreigners and non-residents buy off-plan in Dubai?
Yes. Law No. 7 of 2006 lets non-UAE nationals own freehold property in Dubai's designated areas, where almost all off-plan projects are. UAE residency is not required: a valid passport is enough, and the reservation, contract, Oqood registration and payments can all be done from abroad.
Is buying off-plan in Dubai safe?
The legal framework is protective: the project must be registered with the DLD, payments go into a project escrow account released as construction progress is certified (Law No. 8 of 2007), and the sale is recorded in the Oqood register. In the DLD registry of 1 November 2026, 1,236 of the 1,237 projects under construction had an escrow account. The main remaining risk is the developer's delivery record.
How much of Dubai's property market is off-plan?
Over the 12 months to 4 November 2026, the Dubai Land Department registered 149,920 residential sales, of which 110,979 were off-plan, or 74%. Off-plan sales are concentrated in growing communities such as Dubai World Central, Jumeirah Village Circle, Dubailand Residence Complex and Majan.
How much deposit do I need to buy off-plan in Dubai?
Usually 10 to 20% of the price as a booking amount, plus the 4% DLD fee at Oqood registration; some launches ask for 5 to 10%. On an AED 1,200,000 apartment with a 20% booking amount, that is AED 240,000 plus AED 48,000 of DLD fee, about USD 78,400 in total at the CBUAE peg.
What is a post-handover payment plan?
Part of the price, often 30 to 60%, is paid after you receive the keys, spread over two to five years as set by the developer. The rent collected during that period can cover part of the instalments. The exact split and duration are written in the SPA.
What is the price per sq ft of off-plan property in Dubai?
Over the 12 months to 4 November 2026, the median price of all residential sales registered at the DLD was AED 1,722 per sq ft, about USD 469. In the main off-plan areas it ranged from about AED 1,406 in Dubailand Residence Complex and AED 1,479 in Jumeirah Village Circle to AED 2,750 in Palm Deira and AED 3,190 in Dubai Maritime City.
Can I get a mortgage on an off-plan property in Dubai?
Partly. Central Bank of the UAE rules cap financing on an off-plan property at 50% of its value, and banks only lend on projects they have approved, usually close to completion. The construction phase is generally paid from your own funds through the developer's interest-free payment plan.
What happens if the off-plan project is delayed?
The SPA normally sets a grace period, then penalties or a right to terminate. Your money stays in the escrow account and is only released to the developer as construction milestones are certified. You can follow the official progress of each project in the DLD's Dubai REST app.
What happens if I can't pay an off-plan instalment?
Law No. 13 of 2008 (article 11, as replaced by Law No. 19 of 2020) requires the developer to notify the DLD, which gives you 30 days in writing to pay and attempts a settlement. Only then, depending on the completion percentage certified by the DLD, can the developer terminate, retaining at most 25% (under 60% complete) or 40% (60% and over) of the unit value and refunding the rest.
Can I sell an off-plan property before handover?
Yes, once you have paid the minimum share the developer requires, often 30 to 40%. The developer charges a transfer fee and issues a no-objection certificate, and the new buyer pays the 4% DLD fee again on the resale price. A gain is never guaranteed and depends on the market when you sell.
Does an off-plan property qualify for the Dubai Golden Visa?
Yes. The ICP guide accepts one or more off-plan properties worth at least AED 2,000,000 in total, about USD 544,600, bought from an approved local developer. We check with the DLD that the project and the amount already paid are accepted before you reserve.
Are there taxes on off-plan property in Dubai?
The UAE levies no personal income tax, and the Ministry of Finance states that an individual's real estate income held in their own name, without a licensed business activity, is outside UAE corporate tax. The main purchase cost is the 4% DLD fee. Your country of tax residence may tax your rent or gains under its own law.
Get this month's off-plan shortlist
We send you three to five verified projects with official price lists, payment plans and registered completion dates. At the developer's price, with no buyer commission.
Related guides
- Off-plan payment plans explained
- Off-plan projects registered with the DLD
- Dubai developers and their projects
- How to buy property in Dubai
- Invest in Dubai real estate: the full guide
- Apartments for sale in Dubai
- Dubai property prices 2026
- Price per sq ft by area (DLD)
- Best areas to invest in Dubai
- Dubai rental yields by area
- Dubai Golden Visa through property
- Turnkey property investment in Dubai
- Dubai property management